How to Overlap Metal Roofing: Side Lap, End Lap and Slope

How to overlap metal roofing end to end: a 6 in minimum end lap bedded in tape sealant, a one-rib side lap, screw placement and the 3:12 code slope limit.

How to overlap metal roofing: lap each exposed-fastener panel one full rib on the side (the side lap), and where one sheet will not reach from eave to ridge, overlap it end to end at least 6 inches over a bed of tape sealant (the end lap), the minimum in the Metal Sales PBR-Panel installation guide, the Union Corrugating MasterRib manual and the ASC Building Products light-gauge installation guide. Fabral’s post-frame detail goes further, with a 12-inch total end lap over a purlin. Code sets the slope floor: 3:12 for lapped panels without lap sealant and 1/2:12 with it. On 36-inch R, PBR and MasterRib panels, the panel screws go in the flat beside the major ribs, where those makers’ fastening patterns put them.

By The Roofing Brief Team. Last reviewed: October 2026.

How much should metal roofing overlap?

Overlap exposed-fastener metal panels by one full rib on the side lap and at least 6 inches on the end lap. Six inches is the end lap minimum in the Metal Sales, Union Corrugating and ASC Building Products guides, and the Fabral Standard Details for post-frame roofing lap 12 inches in total over a purlin. None of those guides lengthens the lap as the slope drops; they add sealant instead. Union calls for 3/8 in butyl tape along the top of all lap ribs below 3:12, and Metal Sales recommends sealant on the side laps of every roof.

The side lap covers the outside rib of the lower panel with the outside rib of the upper panel. On a 5-rib panel that is a single interlocking rib. On corrugated sheet the lap shows up in the published coverage: ASC Building Products lists its 2-1/2 in corrugated at 21-1/3 in of coverage on a roof and 24 in on a wall, so the roof side lap uses an extra 2-2/3 in of sheet. Standing seam is different: it has no exposed end lap or screwed side lap, since the ribs join with a snap-lock or a mechanically seamed joint. See snap-lock versus mechanical seam panels for that distinction.

Panel and maker Side lap End lap Panel screw location Source
PBR-Panel and R-Panel, 36 in (Metal Sales) Tape sealant on the underlap rib; 1/4-14 x 7/8 in stitch screws on the lapping rib, 12 in on center 6 in minimum; 3 rows of tape starting 4 in down from the high end of the lower panel In the flat, one screw on each side of each major rib Metal Sales PBR-Panel installation guide
MasterRib, 3/4 in rib, 36 in (Union Corrugating) 3/8 in butyl tape on top of the lap ribs below 3:12; 7/8 in lap tek screw in the rib crown, 24 in on center 6 in at 3:12 or steeper 1-1/2 in double-washered wood screw in the flat, at every purlin Union Corrugating MasterRib manual
2-1/2 in corrugated (ASC Building Products) Butyl mastic or neoprene tape along roof side laps; lap screws 18 in on center maximum 6 in minimum with 2 rows of butyl mastic tape or gunnable sealant; separate detail for panels 28 ft or longer Per ASC pattern; fastener rows 36 in apart maximum ASC light-gauge installation guide
7/8 in corrugated (Western States Metal Roofing) No metal-to-metal side lap screws needed Per maker guide High or low of the corrugation are both accepted; its diagram shows 4 screws per line in the high, every third corrugation Western States screw guide
Post-frame steel panels (Fabral) Side lap sealant connected to the end lap sealant 12 in total, with 3/32 x 1/2 in butyl tape just below the purlin centerline Per Fabral end lap pattern Fabral Standard Details
Standing seam (16 in) Mechanical seam, no screws exposed Continuous, no end lap Concealed clips Profile type

Side lap vs end lap: what each seam does

Every lapped metal roof has two seams to get right: the side lap and end lap. The side lap is the vertical seam between two panels sitting next to each other across the roof. The end lap is the horizontal seam where an upper panel overlaps a lower one as you run up the slope toward the ridge. Both must shed water downhill, so the upper element always sits on top of the lower element, never the reverse. On Metal Sales PBR-Panel, the side lap is sealed with tape on the underlap rib and stitched with 1/4-14 x 7/8 in screws 12 in on center, while the end lap gets three rows of tape across the panel.

Side laps carry most of the wind-driven rain exposure, which is why ASC Building Products tells installers to lap panels away from prevailing weather. End laps carry the sheeting water and are the seam most likely to leak on a low slope, which is why ASC beds them in 2 rows of butyl mastic tape or gunnable sealant and Fabral connects the side lap sealant to the end lap sealant so the two seals form one line.

What is the minimum slope for lapped metal panels?

The International Building Code sets 3:12 (3 units vertical in 12 horizontal) as the minimum slope for lapped, non-soldered metal roof panels installed without applied lap sealant, per IBC Section 1507.4.2 and the matching IRC R905.10.2 for houses. With sealant applied at the laps per the manufacturer’s instructions, the same code allows a minimum slope down to 1/2:12, which is about a 4 percent slope.

In plain terms: at 3:12 and steeper, code lets most exposed-fastener profiles lap dry because gravity clears the water. Between 3:12 and 1/2:12, code requires applied lap sealant, and the maker limits are often stricter: Metal Sales sets 1:12 as the minimum recommended slope for R-Panel and PBR-Panel, Union says slopes under 3:12 are not recommended for MasterRib, and ASC recommends a 3:12 minimum. The warranty follows the maker’s instructions, not the code minimum. Below 1/2:12, lapped panels are off the table; our guide to low slope roofing systems covers what to use on those flatter pitches instead.

If your roof slope is Code allows Maker guides say Lap sealant Source
3:12 or steeper Lapped panels without lap sealant 6 in end lap (Union, ASC, Metal Sales); Union and ASC treat 3:12 as their minimum Recommended on side laps (Metal Sales, ASC) IRC R905.10.2, IBC 1507.4.2; maker guides
1:12 to under 3:12 Lapped panels only with applied lap sealant Metal Sales R-Panel and PBR-Panel allowed to 1:12; Union MasterRib not recommended, 3/8 in tape on lap ribs if used Mandatory IRC R905.10.2; Metal Sales; Union
1/2:12 to under 1:12 Lapped panels only with applied lap sealant Below the minimum in all four exposed-fastener guides cited here Mandatory IRC R905.10.2; maker guides
Below 1/2:12 Not permitted for lapped panels Use standing seam (code minimum 1/4:12) or a membrane system Not applicable IRC R905.10.2

How to overlap metal roofing panels step by step

The sequence below follows the Metal Sales PBR-Panel installation guide, with the Union Corrugating and ASC Building Products values noted where they differ.

  1. Start on the downwind side and set the first panel square. Begin at the end of the roof opposite the prevailing wind so every later side lap faces away from that wind. Square the first panel to the eave with a 3-4-5 triangle, the method in both the Union and ASC guides, because every panel after it references this one.
  2. Lap the side by one full rib over tape sealant. Metal Sales places a bead of Single Bead Tape Sealant on the underlap rib before setting the next panel, then drives 1/4-14 x 7/8 in stitch screws on top of the lapping rib 12 in on center. The lap should sit flat with no gap that daylight shows through.
  3. Run butyl tape before closing an end lap. Metal Sales measures 4 in down from the high end of the lower panel, runs one row of tape there, then adds a row just above and just below it; ASC uses 2 rows of butyl mastic tape or gunnable sealant. Keep the tape full width so it compresses into a gasket.
  4. Overlap the end lap at least 6 inches. Six inches is the minimum in the Metal Sales, Union and ASC guides; Fabral’s post-frame detail laps 12 inches in total over a purlin. Below 3:12 the lap must also be sealed by code. Position the lap so a fastener line passes through the middle row of tape.
  5. Fasten where the maker’s pattern puts the screws. On 36 in R, PBR and MasterRib panels that is the flat beside each major rib: Metal Sales uses #10-14 wood screws into a wood deck and #12-14 self-drillers into steel, and Union uses 1-1/2 in double-washered wood screws at every purlin. Side lap stitch screws go on the rib crown. For 7/8 in corrugated, Western States accepts the high or the low of the corrugation. Seat each washer snug without dimpling the panel, because Union warns that the dimple from an overdriven screw collects water.
  6. Space the fasteners to the panel schedule. The Western States Metal Roofing screw guide places 5 panel screws plus 1 lap screw per screw line at panel ends and 3 panel screws plus 1 lap screw per line on interior supports, with lap screws 12 to 18 inches on center; ASC caps fastener rows at 36 in apart and lap screws at 18 in on center. Follow the maker’s layout for the exact pattern.
  7. Inspect the seam and the sealant. Check that every end lap is fully bedded in butyl, every side lap is tight with stitch screws 12 in on center, and every panel screw sits where the maker’s pattern puts it. Confirm the sealant is continuous with no skips before moving up the slope, and fill any screw that missed the purlin with a #14 stitch screw or sealant, as Union directs.

How to overlap metal roofing end to end (horizontal laps)

To overlap metal roofing end to end, install the whole row of lower (eave) panels first, bed tape sealant across the top of each one, then set the upper panel over it with at least a 6-inch lap, longer on low slopes. Fasten through the sealant so the screws compress it into a gasket. The upper panel always sits on top, so water runs off one sheet onto the next.

An end lap is only needed when a single panel cannot run the full distance from eave to ridge. Metal Sales’ PBR-Panel installation guide, written for its exposed-fastener steel panel, lays the sequence out this way:

  1. Finish the eave course first. Install all of the eave panels before any upper panels go on.
  2. Lay the sealant. Measure 4 inches down from the top (high side) of each eave panel and apply a row of tape sealant across it, then a second and third row just above and below the first.
  3. Lap the upper panel. Set the upper panel over the eave panel with a minimum 6-inch end lap. On slopes below 6:12, use the longer laps in the slope table above.
  4. Fasten through the middle row. Drive #10-14 wood screws (or #12-14 self-drillers into steel) in the panel’s fastening pattern so each one passes through the middle row of tape sealant and into the deck or support below.

The same guide makes two further points that decide whether an end lap stays tight. First, thermal movement: it says expansion should be considered on panels longer than 20 feet, and that runs longer than 40 feet generally need some way to accommodate it. One option it lists is an end lap without fasteners through the lap, so the panels can slide past each other. Second, direction: always shingle panels and trim so water runs down off one piece onto the next.

If your panels run horizontally, as on a wall or a shed side, the rule turns 90 degrees. Metal Sales instructs installers to start horizontal panels at the bottom of the wall and work up, so every course laps over the one below it.

Which way should the overlap face?

Overlap direction is set by the wind: the overlapping edge should face away from the prevailing wind so wind-driven rain blows over the seam instead of into it. ASC Building Products states it as “lap panels away from prevailing weather,” and the Metal Sales guide numbers its installation sequence to install panels against the prevailing wind: start on the downwind end of the roof and move upwind, so each new panel’s side lap tucks behind the one already fastened.

If the exposed edge points into the wind, pressure pushes water sideways under the lap toward the stitch screws, which Metal Sales places only 12 in apart along the lapping rib. The rule is one line: laps shingle downhill for gravity and downwind for pressure.

Do you need sealant on metal roofing overlaps?

Sealant is mandatory on low-slope laps and strongly advised on end laps everywhere. Below 3:12, code and manufacturers require a continuous butyl tape or lap sealant at every overlap. At 3:12 and steeper, many profiles are approved to lap dry, but a butyl bead at end laps is cheap insurance against the seam that fails first.

Use butyl tape between the mating metal surfaces, not a bead of caulk smeared over the outside of a finished seam. Fabral specifies sealant tape or butyl caulking at all side laps and end laps (3/32 x 1/2 in tape at its end laps), Union uses 3/8 in butyl tape, and Metal Sales sells single and double bead tape sealant for the purpose. Butyl stays flexible and moves with the panel, which matters because metal expands and contracts with temperature. For where the tape goes and why exterior caulk fails, see butyl tape for metal roofs, and for the movement it has to survive, metal roof thermal movement.

Common overlap mistakes that cause leaks

Each of these five errors breaks a rule in the maker guides cited above.

  • Screws off the maker’s pattern. On R, PBR and MasterRib panels the panel screws belong in the flat beside the major ribs and the stitch screws on the lapping rib; a screw that misses the purlin needs a #14 stitch screw or sealant in the hole.
  • End lap under 6 inches, or dry on a low slope. Six inches is the floor in every guide cited here, and below 3:12 code requires applied lap sealant.
  • Exterior caulk instead of bedded butyl. Fabral, Metal Sales and ASC all put the tape or sealant between the panels, compressed by the fasteners, not over the finished seam.
  • Overdriven screws. Union warns that an overdriven fastener forms a dimple that collects water and leaks. Seat until the washer is compressed against the metal.
  • Lap facing into the wind. The overlapping edge must point downwind, or wind-driven rain is pushed under the seam.

DIY vs hiring a pro

Overlapping panels on a simple gable at 3:12 or steeper, with single panels under 20 feet long, is within reach for a careful DIY installer who follows the panel schedule; Metal Sales says thermal movement should be considered above 20 feet and generally needs a detail above 40 feet. Low-slope roofs, complex hips and valleys, and any job where the warranty depends on certified installation are better handed to a contractor who does it daily.

The break point is usually slope and complexity. At or above 3:12 on a straight run, the risk is manageable. Below 3:12, where sealed laps and exact fastener torque decide whether the roof leaks, the cost of a redo outweighs the labor saved. Panel coverage math also matters for ordering; see metal roof panel widths and coverage before you buy, and screw pull-out strength for how fastener choice holds the whole system down.

Frequently asked questions

How much should metal roofing overlap on the side?

Side laps should cover at least one full rib of the panel below. On a 5-rib R-panel that means the outside rib of the upper panel sits over the outside rib of the lower panel. Metal Sales seals the side lap with tape on the underlap rib and stitches it with 1/4-14 x 7/8 in screws 12 inches on center. On ASC Building Products 2-1/2 in corrugated, the roof side lap is wide enough that coverage drops from 24 in on a wall to 21-1/3 in on a roof. The lap should lie flat with no visible gap before you fasten it.

How many inches do you overlap metal roofing on the end?

End laps run 6 inches minimum in the Metal Sales, Union Corrugating and ASC Building Products guides, and Fabral’s post-frame detail uses 12 inches in total over a purlin. Bed the lap in tape: Metal Sales uses three rows starting 4 inches down from the top of the lower panel, ASC two rows. Below 3:12, code requires applied lap sealant at every lap.

What is the minimum slope for lapped metal roofing?

IBC Section 1507.4.2 and IRC R905.10.2 set 3:12 as the minimum slope for lapped, non-soldered metal panels without lap sealant. With sealant applied at the laps per the manufacturer’s instructions, the minimum drops to 1/2:12, about a 4 percent slope. Below 1/2:12, a lapped panel system is not permitted and a membrane roof is the correct choice.

How do you overlap metal roofing end to end?

Install the whole eave course first. On each eave panel, Metal Sales measures 4 inches down from the high end and runs a row of tape sealant across the panel, then a row just above and below it. Set the upper panel over it with at least a 6-inch end lap and drive the screws through the middle row of tape into the deck. On panel runs over 40 feet, Metal Sales says some means of handling thermal movement is generally required.

Which way should metal roof panels overlap?

Panels overlap downhill for gravity and downwind for wind pressure. Start installing on the downwind end of the roof and work against the prevailing wind, so each side lap’s exposed edge faces away from the wind. ASC Building Products puts it as lap panels away from prevailing weather, which keeps wind-driven rain blowing over the seam rather than being forced underneath it.

Do you have to use sealant on metal roof overlaps?

Below 3:12, sealant is required by code and by manufacturers at every lap. At 3:12 and steeper, many profiles are approved to lap dry, but a butyl tape bead at end laps is inexpensive protection. Use butyl tape bedded between the metal surfaces, not exterior caulk over a finished seam, because bedded butyl flexes with the panel’s thermal movement.

Where do the screws go on overlapping metal panels?

Follow the maker’s pattern. On 36-inch R, PBR and MasterRib panels, Metal Sales and Union Corrugating put the panel screws in the flat beside the major ribs and the side lap stitch screws on the rib crown; for 7/8-inch corrugated, Western States Metal Roofing accepts the high or the low. Western States’ schedule is 5 panel screws plus 1 lap screw per line at panel ends and 3 plus 1 on interior supports, with lap screws 12 to 18 inches on center.