Residential Roofing Installation: The Step-by-Step Process

Roofing installation in 9 ordered stages: tear-off, deck, IRC R905.1.2 ice barrier, drip edge, starter, 4-nail shingles, ridge vent and final inspection.

By The Roofing Brief Team. Last reviewed: October 2026.

Roofing installation on a house runs through nine ordered stages, from tear-off to the bare deck through the final code inspection, and Hover’s installation guide puts a typical asphalt shingle home of 3,000 square feet or less at about two days: tear-off on day one, install on day two. The order is set by the International Residential Code and the shingle maker’s instructions, because each stage is the water barrier under the one above it: the IRC R905.1.2 ice barrier goes down before the shingles, eave drip edge goes under the underlayment, and every strip shingle gets at least four nails under IRC R905.2.6.

The residential roof installation process at a glance

A residential roof installation replaces every layer of the roof system (deck repairs, underlayment, flashing and field material) from the eave upward so water always sheds onto the layer below. The sequence below is the asphalt shingle order used on most U.S. homes, with the governing section of the 2021 IRC Chapter 9 for each stage; metal and tile swap the field material but keep the same waterproofing order.

Stage What happens Code or maker rule that governs
1. Inspection and estimate Measure, assess deck and ventilation, write scope in squares 1 square = 100 sq ft; GAF Timberline HDZ ships 3 bundles per square
2. Permit and prep Pull permit, protect property, stage materials Local permit; HomeGuide puts roof replacement permits at $150 to $500
3. Tear-off Strip old shingles, felt and flashing to bare deck IRC R908.3.1.1: no recover over 2 or more existing layers
4. Deck inspection and repair Replace rotted or delaminated sheathing IRC R905.2.5: nails must penetrate 3/4 in into the deck or through it
5. Underlayment and ice barrier Ice-and-water shield at eaves, synthetic field underlayment IRC R905.1.2 (24 in inside the wall line); R905.2.2 double underlayment from 2:12 to under 4:12
6. Drip edge and flashing Metal at edges, valleys, walls and penetrations IRC R905.2.8.5 drip edge; R905.2.8.3 step flashing 4 x 4 in; R905.2.8.2 valleys
7. Starter course Sealed starter strip along eaves and rakes Shingle maker’s instructions (for example, GAF Pro-Start)
8. Field shingles Course by course from eave to ridge IRC R905.2.6: at least 4 fasteners per strip shingle; R905.2.2: 2:12 minimum slope
9. Ridge, ventilation, cleanup and final inspection Ridge vent and caps, magnetic sweep, code sign-off IRC R806.2: 1/150 net free vent area, or 1/300 under the exception

Stage 1: Inspection, measurement, and the written estimate

The job starts with a contractor measuring the roof, checking the deck, the R806 attic ventilation and the existing flashing, then writing a line-item scope that names the shingle line, the underlayment, the ice barrier coverage and the flashing details. Ask for deck replacement priced per 4 by 8 foot sheet before anyone starts, because that is the line most likely to change once the old roof is off, and a roof measured only from the ground often misses valley and penetration counts.

Ask for the pitch multiplier used and the total in roofing squares (100 square feet each), because that figure drives both the material order and the labor price. On a 20-square roof at the $5 to $8 per square foot architectural asphalt range in our 2026 roofing cost report, a one-square measuring error moves the bid by $500 to $800.

Stage 2: Permits, property protection, and material staging

Before tear-off, the contractor pulls a roofing permit where local code requires one and protects the property below the work, covering landscaping, moving vehicles and tarping the ground to catch nails. Most U.S. jurisdictions require a permit for a full residential re-roof; HomeGuide prices a roof replacement permit at $150 to $500, while Hover’s guide cites $30 to $200, so ask your building department for the fee schedule. The inspection tied to the permit is what documents that the R905 details were met, which matters to an adjuster or a buyer’s inspector later.

Materials are usually delivered the day before or the morning of. A 20-square order of GAF Timberline HDZ is 60 bundles at about 70 lb each by retailer listings, roughly 4,200 lb, so keep the driveway clear for the boom truck and dumpster, and take pictures and mirrors off walls that share a wall with the roof framing, since nailing vibration travels through the studs.

Stage 3: Tearing off the old roof to the bare deck

Tear-off removes every old layer (shingles, underlayment and flashing) down to the sheathing, because new underlayment and self-adhered ice barrier only bond to a clean, flat deck. Crews strip with roofing forks and shovels, then pull or drive flat every old nail, since a proud nail head can push through and tear a new shingle. Hover’s guide schedules tear-off as day one of a two-day job.

Overlaying new shingles on an existing roof is limited by IRC R908.3.1.1, which bars a new layer over a roof that already has two or more applications, so only a single-layer roof can be overlaid at all. An overlay also leaves the deck uninspected and prevents installing an R905.1.2 ice barrier against the sheathing, which is why a full tear-off is the default whenever the deck condition is unknown.

Stage 4: Inspecting and repairing the roof deck

With the deck exposed, the crew checks the sheathing for rot, delamination and soft spots and replaces damaged sections with OSB or plywood of matching thickness before any new material goes down. The deck has to hold the nails: IRC R905.2.5 requires roofing nails to penetrate at least 3/4 inch into the sheathing or through it, which a spongy panel cannot do. This is the stage that most often generates a legitimate change order.

Watch for the crew walking the whole deck, not just the obvious stains; rot hides around chimneys, vent stacks and valleys. The per-sheet replacement price from the Stage 1 estimate is what you pay for each 4 by 8 foot panel, so ask to see each replaced sheet or a photo of it before it is covered.

Stage 5: Underlayment and the ice-and-water barrier

Underlayment is the water-resistant layer over the bare deck, and where your jurisdiction’s Table R301.2 calls for it, IRC R905.1.2 requires an ice barrier from the eave edge to at least 24 inches inside the exterior wall line, measured horizontally. On a 6:12 roof with a 12 inch overhang that is about 40 inches along the slope, more than one 36 inch roll width; our ice barrier code guide works the math. Over the rest of the field, synthetic underlayment such as GAF FeltBuster (1,000 square foot rolls) has largely replaced 15-pound felt.

The IRC single-layer method laps underlayment 2 inches with 4 inch end laps offset 6 feet, and slopes from 2:12 up to 4:12 need double underlayment under R905.2.2. Self-adhered membrane in valleys is permitted under R905.2.8.2 in place of the listed valley linings, and wrapping penetrations with it follows the shingle maker’s instructions, which R903.1, R904.1 and R905.1 make enforceable.

Stage 6: Drip edge and flashing

Drip edge finishes the eaves and rakes, and flashing seals every change in plane and every penetration. IRC R905.2.8.5 sets the order: underlayment goes over the drip edge at the eaves and under it at the rakes, with drip edge lapped at least 2 inches, extending at least 1/4 inch below the sheathing and 2 inches onto the deck, and fastened at no more than 12 inches on center. Step flashing interleaves shingle by shingle where the roof meets a wall.

Key locations and the rule for each:

  • Eaves and rakes: drip edge, required by IRC R905.2.8.5
  • Walls and dormers: step flashing at least 4 inches high and 4 inches wide (IRC R905.2.8.3) plus counter flashing
  • Chimneys: apron, step and counter flashing, plus a cricket on the up-slope side when the chimney is more than 30 inches wide (IRC R903.2.2)
  • Valleys: open metal lining at least 24 inches wide, closed valleys over 36 inch roll roofing, or ASTM D1970 membrane in lieu (IRC R905.2.8.2)
  • Vents and pipes: boot flashings sized to the pipe and installed per the shingle maker’s instructions (IRC R905.2.8.4)

Metal flashing must be corrosion resistant and at least 0.019 inch thick (No. 26 galvanized sheet) under IRC R903.2.1.

Stage 7: The starter course

Starter shingles are a sealed strip installed along the eaves and rakes first, with the adhesive positioned to grip the bottom edge of the first visible course; GAF’s Pro-Start comes in bundles covering 120.33 lineal feet. They seal the perimeter, the zone where wind starts lifting shingles, and set a straight line for course one. Flipping a regular shingle upside down puts the sealant strip in the wrong place; where the shingle maker accepts a site-made starter, it is cut with the tabs removed rather than flipped, as our guide to cutting a starter strip from 3-tab shingles explains.

On a 20-square roof, two bundles of a 120 lineal foot starter cover about 240 feet of eaves and rakes, so the starter is a small line item (about $81 to $110 at October 2026 listings for Pro-Start) next to 60 bundles of field shingles. Look for a clean, factory-adhesive edge along every eave and rake before field shingles begin.

Stage 8: Installing the field shingles

Field shingles go on course by course from the eave upward, each row lapping the one below. IRC R905.2.6 requires the maker’s fastener count but not less than four nails per strip shingle, placed in the marked nailing zone; GAF’s Timberline HDZ spec sheet lists 13 1/4 by 39 3/8 inch shingles at a 5 5/8 inch exposure, 64 pieces per square, so four nails per piece is 256 nails per square. A nail above the marked zone falls outside the installation instructions the maker’s warranty is written against.

Nail placement is what most wind and warranty disputes turn on, so ask the crew lead what nailing pattern the maker’s instructions call for on your roof and check a few courses from a ladder before they are covered. Minimum slopes by field material, from the IRC:

  • Asphalt shingles: 2:12 minimum, double underlayment from 2:12 up to 4:12 (IRC R905.2.2)
  • Metal roof panels: 3:12 for lapped nonsoldered seams without sealant, 1/2:12 with applied lap sealant, 1/4:12 for standing seam (IRC R905.10.2)
  • Concrete or clay tile: 2 1/2:12 minimum (IRC R905.3.2)

Stage 9: Ridge, ventilation, cleanup, and the final inspection

The last stage caps the ridges, completes attic ventilation, clears every nail and passes the code inspection. A ridge vent is cut into the peak and paired with soffit intake; IRC R806.2 sets the minimum net free vent area at 1/150 of the attic floor area, or 1/300 when the exception’s conditions are met, which our 1/300 rule worked example converts into linear feet of ridge vent. Ridge cap shingles such as GAF Seal-A-Ridge then cover the vent and the hips.

Cleanup means a magnetic sweep of the yard and gutters (a 20-square roof takes roughly 5,100 to 6,400 nails at four per shingle) and a full debris haul. The permit inspector, or the contractor’s final walk on a permit-exempt job, checks flashing, nailing and ventilation. Get the final invoice, the manufacturer warranty registration and the passed-inspection record in writing before releasing final payment. Many owners also ask for a roofing certificate of completion, a signed record of the contractor, dates, materials and warranty numbers.

What should you see at each stage? Decision table

If you see this What it means What to ask for
New shingles going over two existing layers Recover not permitted (IRC R908.3.1.1) Full tear-off to the deck
A single 36 in ice barrier course on a roof with a 12 in overhang, in a jurisdiction that requires it Likely short of 24 in inside the wall line (about 40 in needed along the slope at 6:12) A second course at the eave
Drip edge laid on top of the underlayment at the eave Reversed from IRC R905.2.8.5 Underlayment over eave drip edge, under rake drip edge
Fewer than 4 nails per shingle, or nails above the marked zone Below IRC R905.2.6 and outside the maker’s instructions Re-nail before the next course covers it
Chimney wider than 30 in with no cricket Missing IRC R903.2.2 cricket Cricket or saddle before shingling past the chimney
Roof slope between 2:12 and 4:12 with one layer of underlayment IRC R905.2.2 requires double underlayment Second layer or full self-adhered membrane
Ridge vent added but soffits blocked by insulation Exhaust without intake; R806.3 requires a 1 in air space at the vent Baffles at the eaves before closing up

How the process changes for metal and tile roofs

The nine stages hold for any pitched residential roof, but the field-material stages change. Metal panels need trim, closures and the maker’s fastener schedule, and IRC R905.10.2 sets their minimum slope by seam type, from 1/4:12 for standing seam to 3:12 for lapped panels without sealant. Tile adds a structural load check and starts at 2 1/2:12 under R905.3.2. The waterproofing stages beneath (deck, underlayment, ice barrier and flashing) keep the same order on all three.

Installed cost moves with the material: our 2026 roofing cost report lists $5 to $8 per square foot for architectural asphalt, $10 to $18 for standing-seam metal and $7 to $19 for concrete tile. For the material-specific sequence, see the dedicated metal roof installation walkthrough, and the residential roofing guide compares material, cost, lifespan and code by region.

What to know before installation day

Two things decide how smoothly an installation goes: a written scope (deck price per sheet, underlayment and ice barrier spec, flashing details and the total in squares) and a realistic timeline, which Hover’s guide puts at about two days for a typical home of 3,000 square feet or less and up to five days or longer with weather or supply delays. Crews will not lay shingles in rain because self-adhered underlayment and shingle sealant strips need a dry surface to bond.

For the labor-only view of scheduling, the roof replacement timeline by material breaks down day-by-day expectations. New builds follow a slightly different order set by the framing schedule, covered in the new construction roofing guide, and state code adoption and contractor licensing rules are in our 2026 state roofing code and licensing report.

Frequently asked questions

How long does a residential roof installation take?

Hover’s installation guide puts a typical asphalt shingle home of 3,000 square feet or less at about two days: tear-off and deck work on day one, underlayment through ridge and cleanup on day two. Weather or material supply can stretch it to five days or more, since crews will not install in rain because sealant strips and self-adhered underlayment need a dry surface to bond.

What are the steps in installing a new roof?

The residential roof installation process runs in nine ordered stages: inspection and estimate, permit and property prep, tear-off to the bare deck, deck inspection and repair, underlayment and the IRC R905.1.2 ice barrier, drip edge and flashing, the starter course, field shingles installed eave to ridge with at least four nails each, and finally ridge venting, cleanup and the code inspection.

Do I need a permit to install a new roof?

Most U.S. jurisdictions require a permit for a full residential re-roof, and the contractor usually pulls it; HomeGuide prices roof replacement permits at $150 to $500. The permit ties the job to an inspection of flashing, nailing and ventilation, and that record is what an insurer or a buyer’s inspector will ask for later, so confirm the permit is in your written scope.

Can a new roof go over the old shingles?

Only over a single existing layer. IRC R908.3.1.1 does not permit a new roof covering over a roof that already has two or more applications. An overlay also leaves the deck uninspected and blocks an ice barrier against the sheathing, so a full tear-off is the default whenever the deck condition is unknown or the jurisdiction requires an R905.1.2 ice barrier.

What is the most important stage of a roof installation?

The waterproofing stages beneath the shingles: deck repair, underlayment and the ice barrier, and flashing. They are where the code sets hard numbers (24 inches inside the wall line for the ice barrier, 4 by 4 inch step flashing, a cricket behind chimneys over 30 inches wide), and they are covered up by the time the shingles go on, so inspect them before the field shingles reach them.

What should I watch for during my roof installation?

Watch for a full tear-off to bare deck, replacement of any rotted sheathing, ice-and-water shield to 24 inches inside the wall line where required, eave drip edge under the underlayment and rake drip edge over it, a sealed starter course at the perimeter, and at least four nails per shingle in the marked zone. At the end, confirm the magnetic nail sweep, the passed inspection and the warranty registration before final payment.